NEWS CENTER
Position:
Homepage
/
/
/
Hunan Province built 704 electric vehicle charging fast charging stations

Hunan Province built 704 electric vehicle charging fast charging stations

(Summary description)State Grid Hunan Electric Power announced yesterday that it has built a total of 704 fast-charging stations, 4,053 fast-charging piles, and 1,500 slow-charging piles, with a total power of over 200,000 kilowatts. Village + high-speed" electric vehicle charging infrastructure network.

Hunan Province built 704 electric vehicle charging fast charging stations

(Summary description)State Grid Hunan Electric Power announced yesterday that it has built a total of 704 fast-charging stations, 4,053 fast-charging piles, and 1,500 slow-charging piles, with a total power of over 200,000 kilowatts. Village + high-speed" electric vehicle charging infrastructure network.

Information

State Grid Hunan Electric Power announced yesterday that it has built a total of 704 fast-charging stations, 4,053 fast-charging piles, and 1,500 slow-charging piles, with a total power of over 200,000 kilowatts. Village + high-speed" electric vehicle charging infrastructure network.

 

On June 3, the first day of the Dragon Boat Festival holiday, all parts of Hunan ushered in the peak of returning home. As of 12:00 noon, the State Grid Loudi "Taxi Home" charging station located on Jixing South Road in Loudi has accumulated 3,076.95 kWh of charging capacity in the past two days, and the number of charging times has reached 112 times. As the first "light-storage-charge" integrated centralized electric vehicle charging station in Hunan, the charging station was completed and put into operation in September last year. It is equipped with 26 120-kilowatt DC fast-charging piles, and uses rooftop 147-kilowatt photovoltaic power generation and energy storage. It can meet the charging needs of 52 electric vehicles at the same time.

 

 

In April 2020, the electric vehicle charging station landed in Shibadong Village, Huayuan County, and 5 DC fast charging double-gun charging piles with a power of 120 kilowatts settled in the parking lot of Shibadong Village Scenic Area. Since the completion of the charging station, the accumulative charging capacity has reached 27,060 kWh, and the accumulative charging times have reached 1,178 times. During the Dragon Boat Festival holiday, there is an endless stream of tourists who drive electric cars to travel.

 

State Grid Hunan Electric Power introduced that it will continue to carry out the "hundred counties, thousands of piles, thousands of billions of degrees" to promote the high-quality development of the charging service industry.

Keyword:

Scan the QR code to read on your phone

Relevant Information

Follow us:

ewm   ewm   ewm

Copyright © Zhengzhou Senyuan New Energy Technology Co., Ltd.        |       豫ICP备12010000号

Powered by www.300.cn     Supports IPV6 

版权所有 © 郑州森源新能源科技有限公司

网站建设:中企动力         本网站已支持IPV6