NEWS CENTER
Position:
Homepage
/
/
/
Chengdu launches 2022 municipal-level subsidy declaration for charging facilities

Chengdu launches 2022 municipal-level subsidy declaration for charging facilities

(Summary description)In order to speed up the construction of new energy vehicle charging facilities in the city, in accordance with the "Several Policies for Supporting the Development, Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry in Chengdu" and the "Detailed Implementation Rules for Several Policies for Supporting the Development, Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry in Chengdu" ( According to documents such as "Charging and Replacing Infrastructure Parts)", the relevant work notification for the city-level subsidy declaration of new energy vehicle charging facilities in Chengdu in 2022 will be organized as follows.

Chengdu launches 2022 municipal-level subsidy declaration for charging facilities

(Summary description)In order to speed up the construction of new energy vehicle charging facilities in the city, in accordance with the "Several Policies for Supporting the Development, Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry in Chengdu" and the "Detailed Implementation Rules for Several Policies for Supporting the Development, Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry in Chengdu" ( According to documents such as "Charging and Replacing Infrastructure Parts)", the relevant work notification for the city-level subsidy declaration of new energy vehicle charging facilities in Chengdu in 2022 will be organized as follows.

Information

Notice on organizing the declaration of municipal subsidies for new energy vehicle charging facilities in Chengdu in 2022

Cheng Jing Xin Cai [2022] No. 16

 

The competent departments of industry and informatization (energy), development and reform departments, and financial departments of all districts (cities) and counties, and relevant units (enterprises):

 

In order to speed up the construction of new energy vehicle charging facilities in the city, in accordance with the "Several Policies of Chengdu to Support the Development, Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry" (Chengjing Xinfa [2019] No. 6) and "Chengdu Supports Hydrogen Energy and New Energy According to documents such as the Detailed Rules for the Implementation of Several Policies for the Development and Promotion and Application of the Automobile Industry (Infrastructure for Charging and Swapping) (Chengjingxin Office [2020] No. 1), Chengdu will now organize the application for municipal subsidies for new energy vehicle charging facilities in Chengdu in 2022. The relevant work notices are as follows.

 

 

1. Subject of declaration

 

The applicant is the investor of the charging and swapping facility project, and has the ownership of the charging and swapping facility project. If there are multiple investment entities in the same project, the relevant units shall negotiate and determine one investment entity as the reporting entity.

 

2. Scope of application

 

(1) Construction subsidy: Construction subsidy can be applied for projects that are completed and put into operation during the period from January 1, 2021 to December 31, 2021, and qualified charging and swapping facilities can apply for construction subsidies, and the same project cannot be repeatedly applied.

 

(2) Operation subsidy: From January 1, 2021 to December 31, 2021, the charging capacity and eligible charging and swapping facilities projects can apply for operating subsidies.

 

3. Application time

 

The application unit shall submit the application materials to the competent department of industry and information technology (electricity) in the district (city) county where the project is located from May 24 to June 23, 2022. Failure to submit the application materials within the specified time will be regarded as automatic abandonment. The relevant departments of all districts (cities) and counties will jointly submit a document to the Municipal Economic and Information Bureau before July 14, 2022 after summarizing the preliminary review.

 

4. Application conditions

 

(1) The application unit (individual) and the conditions required for the application project and the corresponding subsidy standards shall comply with the "Detailed Implementation Rules for Several Policies in Chengdu to Support the Development and Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry (Charging and Swapping Infrastructure)" (Chengjingxinban [2020] No. 1) (see attachment) related requirements.

 

(2) For the application for construction subsidies, the installed power of the charging and swapping facilities built and put into operation in the administrative area of ​​Chengdu in 2021 shall not be less than 1000kW.

 

(3) The applicant must connect all charging and swapping facilities, including the declared project, to the Chengdu New Energy Vehicle and Charging Facilities Monitoring and Supervision Platform (hereinafter referred to as the municipal vehicle pile platform), and charge and replace the battery according to the requirements of the municipal vehicle pile platform. Infrastructure information entry and real-time data push.

 

V. Application methods and requirements

 

(1) The reporting unit bundles its projects within the administrative area of ​​the same district (city) county, compiles and binds the application materials into a booklet (three copies of the paper version and one electronic version), and submits it to the district where the project is located ( City) County Industry and Information Technology (Electricity) Competent Department.

 

1. The reporting unit is responsible for the authenticity of the application materials, and if it provides false information to defraud municipal subsidies, the reporting unit (individual) will be disqualified from reporting.

 

2. Applicants must prepare application materials in accordance with the "Detailed Implementation Rules for Several Policies Supporting the Development and Promotion and Application of the Hydrogen Energy and New Energy Vehicle Industry in Chengdu (Infrastructure for Charging and Swapping)" (Chengjingxinban [2020] No. 1).

 

Uniform data preparation format:

 

(1) The application materials shall be in a hard cover, A4 paper, and bound into a booklet;

 

(2) The cover of the data is unified as "Chengdu 2022 Municipal Subsidy Application Form for New Energy Vehicle Charging Facilities", and the cover shall be followed by the official name of the reporting unit, the scope of the reporting area, the reporting time, the contact person and contact information, and the official seal of the unit shall be affixed;

 

(3) Compile the catalogue of application materials in the order in which the materials are provided as required by the "Implementation Rules";

 

(4) The content of the information (copy) is clear and the content of the electronic version (pdf format) is complete.

 

(2) If the materials required for the application project are indeed missing due to objective reasons, the application unit must submit other verification materials (explanations) in the application materials.

 

(3) The municipal vehicle pile platform should do a good job of guiding the access of charging and replacing facilities, and open up green channels for data access and issuance of certificates; the municipal new energy automobile industry alliance should play the role of industry guidance and service, and organize enterprises to carry out declaration policy publicity, Guide and supervise enterprises to carry out declaration work according to law.

 

(4) The competent departments of industry and informatization (electricity) in all districts (cities) should actively organize the declaration, classification inspection, on-site inspection and other related work of municipal subsidy funds for territorial charging and swapping facilities, and conduct relevant work in conjunction with territorial development and reform, finance and other departments Jointly review, summarize the application materials and review results and submit them to the Municipal Economic and Information Bureau.

 

6. Policy consultation telephone

 

Luo Jun, Electric Power Division, Municipal Economic and Information Bureau: 61885848

 

Municipal Development and Reform Commission Environment and Resources Department Chen Hu: 61884049

 

Municipal Finance Bureau Industry Division Jing Linzhi: 61882554

 

City car pile platform Zhang Sijie: 67565008

Keyword:

Scan the QR code to read on your phone

Relevant Information

Follow us:

ewm   ewm   ewm

Copyright © Zhengzhou Senyuan New Energy Technology Co., Ltd.        |       豫ICP备12010000号

Powered by www.300.cn     Supports IPV6 

版权所有 © 郑州森源新能源科技有限公司

网站建设:中企动力         本网站已支持IPV6