NEWS CENTER
Position:
Homepage
/
/
/
The Ministry of Transport drafted an action plan to accelerate the construction of charging infrastructure along the highway

The Ministry of Transport drafted an action plan to accelerate the construction of charging infrastructure along the highway

  • Categories:Industry Policy
  • Author:郑州森源新能源
  • Origin:
  • Time of issue:2022-05-06
  • Views:0

(Summary description)Recently, at the regular press conference of the Ministry of Transport in April, the relevant person in charge of the Ministry of Transport said that at present, 3,102 expressway service areas across the country have built charging and swapping infrastructure, and a total of about 13,374 charging piles have been built. It is concentrated in the Beijing-Tianjin-Hebei, Yangtze River Delta, Pearl River Delta and other eastern regions, and the coverage rate in the western and northeastern regions is relatively low.



The Ministry of Transport and the National Energy Administration and other departments have drafted an action plan to accelerate the construction of charging infrastructure along the highway. At present, the action plan is soliciting opinions from various places.

The Ministry of Transport drafted an action plan to accelerate the construction of charging infrastructure along the highway

(Summary description)Recently, at the regular press conference of the Ministry of Transport in April, the relevant person in charge of the Ministry of Transport said that at present, 3,102 expressway service areas across the country have built charging and swapping infrastructure, and a total of about 13,374 charging piles have been built. It is concentrated in the Beijing-Tianjin-Hebei, Yangtze River Delta, Pearl River Delta and other eastern regions, and the coverage rate in the western and northeastern regions is relatively low.



The Ministry of Transport and the National Energy Administration and other departments have drafted an action plan to accelerate the construction of charging infrastructure along the highway. At present, the action plan is soliciting opinions from various places.

  • Categories:Industry Policy
  • Author:郑州森源新能源
  • Origin:
  • Time of issue:2022-05-06
  • Views:0
Information

Recently, at the regular press conference of the Ministry of Transport in April, the relevant person in charge of the Ministry of Transport said that at present, 3,102 expressway service areas across the country have built charging and swapping infrastructure, and a total of about 13,374 charging piles have been built. It is concentrated in the Beijing-Tianjin-Hebei, Yangtze River Delta, Pearl River Delta and other eastern regions, and the coverage rate in the western and northeastern regions is relatively low.

 

The Ministry of Transport and the National Energy Administration and other departments have drafted an action plan to accelerate the construction of charging infrastructure along the highway. At present, the action plan is soliciting opinions from various places.

 

 

The Ministry of Transport has always attached great importance to the construction of charging facilities along the highway. Since 2014, a number of documents have been issued to deploy additional charging facilities in expressway service areas. In 2021, the green travel "continuity project" will be listed as one of the practical facts of transportation that is closer to people's livelihood, and promote the construction of charging piles (stations) in transportation service stations such as expressway service areas in key areas such as major urban agglomerations and metropolitan areas. ) to facilitate long-distance green travel for the masses.

 

According to statistics, at present, 3,102 expressway service areas across the country have built charging and swapping infrastructure, and a total of about 13,374 charging piles have been built, mainly in the Beijing-Tianjin-Hebei, Yangtze River Delta, Pearl River Delta and other eastern regions, and the western and northeastern regions are covered. rate is relatively low. Compared with the rapid development of new energy vehicles, the development of charging facilities along the highway is indeed lagging behind, and the number of installations is insufficient and the coverage is insufficient.

 

 

In order to serve the national "dual carbon" strategy, facilitate the production and life of the masses, and speed up the construction of transportation that is satisfactory to the people, this year, the Ministry of Transport will accelerate the construction of charging infrastructure along the highway, and has studied and drafted an action plan for accelerating the construction of charging infrastructure along the highway. It is planned to accelerate the formation of highways with "fixed charging facilities as the main body and mobile charging facilities as supplements" in accordance with the principle of "piling stations first, promoting demand by supply, adjusting measures to local conditions, advancing by classification, wide coverage, moderately advanced, universal and open, intelligent and efficient" A network of charging facilities to continuously meet the growing demand for electric vehicle charging.

Keyword:

Scan the QR code to read on your phone

Relevant Information

Follow us:

ewm   ewm   ewm

Copyright © Zhengzhou Senyuan New Energy Technology Co., Ltd.        |       豫ICP备12010000号

Powered by www.300.cn     Supports IPV6 

版权所有 © 郑州森源新能源科技有限公司

网站建设:中企动力         本网站已支持IPV6